Project Completion Certificate (Ground Water)
Scheme ID: 20083436 Name of Scheme: KARAMPUR BARSAWAN WSS No. of Villages: 3 No. of Habitation Covered: 7
Total Population Covered: 4090 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Mar-2024 Actual Date of Completion (Capex): 04-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of Tubewell Assembly 24.09/108.74 KARAMPUR BARSAWAN 26.639982 82.492661
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Ac Submersible Pump 15 hp 0.85/46 KARAMPUR BARSAWAN 26.639982 82.492661
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 250KL/16 KARAMPUR BARSAWAN 26.659282 82.432665
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 200 0.0245
2 DI - K7 150 0.016
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6: Class PE-100 90 0.677
2 HDPE PIPE PN-6: Class PE-100 75 0.53150
3 HDPE PIPE PN-6: Class PE-100 63 18.479
4 HDPE PIPE PN-6: Class PE-100 110 2.117
5 HDPE PIPE PN-6: Class PE-100 125 0.780
6 HDPE PIPE PN-6: Class PE-100 140 1.894
7 HDPE PIPE PN-6: Class PE-100 160 0.005
HSC Connection
Sno. Total Nos.
1 540
Other Details
3.40
3.40
3.41
04-Aug-2025
05-Aug-2025