| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20083436 | Name of Scheme: KARAMPUR BARSAWAN WSS | No. of Villages: 3 | No. of Habitation Covered: 7 |
| Total Population Covered: 4090 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 08-Mar-2024 | Actual Date of Completion (Capex): 04-May-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Lowering of Tubewell Assembly | 24.09/108.74 | KARAMPUR BARSAWAN | 26.639982 | 82.492661 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Ac Submersible Pump 15 hp | 0.85/46 | KARAMPUR BARSAWAN | 26.639982 | 82.492661 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | RCC | 250KL/16 | KARAMPUR BARSAWAN | 26.659282 | 82.432665 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI - K7 | 200 | 0.0245 | |
| 2 | DI - K7 | 150 | 0.016 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN-6: Class PE-100 | 90 | 0.677 | |
| 2 | HDPE PIPE PN-6: Class PE-100 | 75 | 0.53150 | |
| 3 | HDPE PIPE PN-6: Class PE-100 | 63 | 18.479 | |
| 4 | HDPE PIPE PN-6: Class PE-100 | 110 | 2.117 | |
| 5 | HDPE PIPE PN-6: Class PE-100 | 125 | 0.780 | |
| 6 | HDPE PIPE PN-6: Class PE-100 | 140 | 1.894 | |
| 7 | HDPE PIPE PN-6: Class PE-100 | 160 | 0.005 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 540 |