| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20084141 | Name of Scheme: BAURI GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 7 |
| Total Population Covered: 5910 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Aug-2024 | Actual Date of Completion (Capex): 31-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 24/98.73 | BAURI | 27.884163 | 79.610216 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VP PUMP -1 | 72.66/45 | BAURI | 27.884163 | 79.610216 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT -1 | 350/16 | BAURI | 27.884348 | 79.610246 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7 | 200 | 0.059 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE / 6KG | 63 | 12.407 | |
| 2 | HDPE / 6KG | 75 | 2.500 | |
| 3 | HDPE / 6KG | 90 | 1.721 | |
| 4 | HDPE / 6KG | 110 | 2.295 | |
| 5 | HDPE / 6KG | 140 | 1.127 | |
| 6 | HDPE / 6KG | 160 | 3.155 | |
| 7 | HDPE / 6KG | 180 | 0.082 | |
| 8 | HDPE / 6KG | 200 | 0.025 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |