Project Completion Certificate (Ground Water)
Scheme ID: 20084141 Name of Scheme: BAURI GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 7
Total Population Covered: 5910 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Aug-2024 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24/98.73 BAURI 27.884163 79.610216
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VP PUMP -1 72.66/45 BAURI 27.884163 79.610216
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 350/16 BAURI 27.884348 79.610246
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 200 0.059
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6KG 63 12.407
2 HDPE / 6KG 75 2.500
3 HDPE / 6KG 90 1.721
4 HDPE / 6KG 110 2.295
5 HDPE / 6KG 140 1.127
6 HDPE / 6KG 160 3.155
7 HDPE / 6KG 180 0.082
8 HDPE / 6KG 200 0.025
HSC Connection
Sno. Total Nos.
Other Details
3.79
0.00
3.79
30-Nov-2024
06-Dec-2024