| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20084152 | Name of Scheme: DIURAS GRAM PANCHAYAT VILLAGE WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 3000 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 09-Mar-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 24/94.35 | DIURAS | 28.168332 | 79.74043 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VP PUMP -1 | 37.20/45 | DIURAS | 28.168332 | 79.74043 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT -1 | 175/12 | DIURAS | 28.168468 | 79.740662 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE / 6KG | 63 | 1.533 | |
| 2 | HDPE / 6KG | 75 | 1.230 | |
| 3 | HDPE / 6KG | 90 | 0.465 | |
| 4 | HDPE / 6KG | 110 | 0.066 | |
| 5 | HDPE / 6KG | 140 | 0.385 | |
| 6 | HDPE / 6KG | 160 | 0.032 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 515 |