| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20084305 | Name of Scheme: KARAMPUR PARVARBHAR WSS | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 2230 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 23-Mar-2023 | Actual Date of Completion (Capex): 22-Mar-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell-1 | 24/64.30 | KARAMPUR PARVARBHAR | 26.267449 | 81.935064 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump-1 | 465LPM/45M | KARAMPUR PARVARBHAR | 26.267471 | 81.935075 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 125KL/12M | KARAMPUR PARVARBHAR | 26.267253 | 81.934871 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI Pipe K-7 | 100 | 0.035 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE-PN-6 , PE-100 | 63 | 5.383 | |
| 2 | HDPE-PN-6 , PE-100 | 75 | 0.150 | |
| 3 | HDPE-PN-6 , PE-100 | 90 | 2.101 | |
| 4 | HDPE-PN-6 , PE-100 | 110 | 0.185 | |
| 5 | HDPE-PN-6 , PE-100 | 125 | 0.467 | |
| 6 | HDPE-PN-6 , PE-100 | 140 | 0.113 | |
| 7 | HDPE-PN-6 , PE-100 | 160 | 0.042 | |
| 8 | HDPE-PN-6 , PE-100 | 180 | 0.183 | |
| 9 | HDPE-PN-6 , PE-100 | 200 | 0.127 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 403 |