Project Completion Certificate (Ground Water)
Scheme ID: 20084305 Name of Scheme: KARAMPUR PARVARBHAR WSS No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2230 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 23-Mar-2023 Actual Date of Completion (Capex): 22-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell-1 24/64.30 KARAMPUR PARVARBHAR 26.267449 81.935064
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 465LPM/45M KARAMPUR PARVARBHAR 26.267471 81.935075
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 125KL/12M KARAMPUR PARVARBHAR 26.267253 81.934871
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE-PN-6 , PE-100 63 5.383
2 HDPE-PN-6 , PE-100 75 0.150
3 HDPE-PN-6 , PE-100 90 2.101
4 HDPE-PN-6 , PE-100 110 0.185
5 HDPE-PN-6 , PE-100 125 0.467
6 HDPE-PN-6 , PE-100 140 0.113
7 HDPE-PN-6 , PE-100 160 0.042
8 HDPE-PN-6 , PE-100 180 0.183
9 HDPE-PN-6 , PE-100 200 0.127
HSC Connection
Sno. Total Nos.
1 403
Other Details
1.88
1.88
1.89
30-Jan-2025
01-Aug-2025