Project Completion Certificate (Ground Water)
Scheme ID: 20084376 Name of Scheme: RADHAUPUR SIKANDARPUR & ARELI ISMAILPUR MULTI GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 3300 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 30-Jun-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24/98.33 RADHAUPUR SIKANDARPUR & ARELI ISMAILPUR 28.025662 79.880319
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VP PUMP -1 38.40/45 RADHAUPUR SIKANDARPUR & ARELI ISMAILPUR 28.025662 79.880319
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 175/16 RADHAUPUR SIKANDARPUR & ARELI ISMAILPUR 28.025732 79.880364
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 150 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6KG 63 3.488
2 HDPE / 6KG 75 1.737
3 HDPE / 6KG 90 0.899
4 HDPE / 6KG 110 0.379
5 HDPE / 6KG 140 0.915
6 HDPE / 6KG 160 1.017
7 HDPE / 6KG 200 0.154
HSC Connection
Sno. Total Nos.
1 600
Other Details
2.23
0.00
2.23
29-Sep-2023
06-Dec-2024