| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20084380 | Name of Scheme: BAJHERA BAJHERI GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 1770 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 20-Jun-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 18/84.44 | BAJHERA BAJHERI | 28.065282 | 79.862098 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VP PUMP -1 | 22.8 M3 / 45 M | BAJHERA BAJHERI | 28.065282 | 79.862098 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT -1 | 100 KL-12 M | BAJHERA BAJHERI | 28.065295 | 79.862055 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7 | 100 | 0.039 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE / 6Kg | 63 | 2.772 | |
| 2 | HDPE / 6Kg | 75 | 1.083 | |
| 3 | HDPE / 6Kg | 90 | 0.355 | |
| 4 | HDPE / 6Kg | 110 | 0.082 | |
| 5 | HDPE / 6Kg | 140 | 0.518 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 344 |