Project Completion Certificate (Ground Water)
Scheme ID: 20084719 Name of Scheme: Tilakpur Rajohapur PWS No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2637 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jan-2022 Actual Date of Completion (Capex): 23-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.791
2 HDPE 90 2.253
3 HDPE 110 .541
4 HDPE 140 .481
5 HDPE 160 1.565
HSC Connection
Sno. Total Nos.
Other Details
2.52
0.00
2.84
07-Jun-2024
24-Jul-2024