Project Completion Certificate (Ground Water)
Scheme ID: 20084723 Name of Scheme: Chapauli PWS No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2112 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 01-Jun-2024 Actual Date of Completion (Capex): 12-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.139
2 HDPE 90 1.451
3 HDPE 110 .178
4 HDPE 125 1.331
HSC Connection
Sno. Total Nos.
Other Details
1.89
0.00
0.00
01-Mar-2025
02-Mar-2025