| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20084934 | Name of Scheme: DANDI MAHMOODPUR WSS | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 2450 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 20-Feb-2024 | Actual Date of Completion (Capex): 27-Nov-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Lowering of Tubewell Assembly | 18.07/114.41 | Dandi Mahmoodpur | 26.521738 | 82.544133 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Ac Submersible Pump 10 HP | 30.6/43 | Dandi Mahmoodpur | 26.521738 | 82.544133 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | RCC | 150/12 | Dandi Mahmoodpur | 26.521816 | 82.544097 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI-K7 | 100 | 0.021 | |
| 2 | DI-K7 | 150 | 0.019 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6: Class PE-100 | 63 | 7.0131 | |
| 2 | HDPE Pipe PN-6: Class PE-100 | 75 | 1.0483 | |
| 3 | HDPE Pipe PN-6: Class PE-100 | 90 | 0.2203 | |
| 4 | HDPE Pipe PN-6: Class PE-100 | 110 | 0.3261 | |
| 5 | HDPE Pipe PN-6: Class PE-100 | 125 | 0.2545 | |
| 6 | HDPE Pipe PN-6: Class PE-100 | 140 | 0.3234 | |
| 7 | HDPE Pipe PN-6: Class PE-100 | 180 | 0.5274 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 341 |