Project Completion Certificate (Ground Water)
Scheme ID: 20084938 Name of Scheme: KARMAINI WSS No. of Villages: 3 No. of Habitation Covered: 6
Total Population Covered: 2800 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 20-Feb-2024 Actual Date of Completion (Capex): 14-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 17.99/60.35 Karmaini 26º 23' 31.229" N 82º 45' 23.265" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 30/45 Karmaini 26º 23' 31.229" N 82º 45' 23.265" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC-Zink Alum Tank 125/14 Karmaini 82º 45' 23.265" E 82º 45' 23.265" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 3.745
2 HDPE Pipe PN-6: Class PE-100 75 3.40
3 HDPE Pipe PN-6: Class PE-100 90 0.315
4 HDPE Pipe PN-6: Class PE-100 110 0.533
5 HDPE Pipe PN-6: Class PE-100 140 0.455
HSC Connection
Sno. Total Nos.
1 240
Other Details
1.82
0.00
1.81
14-Apr-2026
15-Apr-2026