Project Completion Certificate (Ground Water)
Scheme ID: 20084940 Name of Scheme: GAUSPUR KAKRAHIYA WSS No. of Villages: 2 No. of Habitation Covered: 13
Total Population Covered: 4930 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 21-Feb-2023 Actual Date of Completion (Capex): 20-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30/68.71 Gauspur Kakrahiya 26º 21' 34.231" N 82º 44' 22.344" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump 51/46 Gauspur Kakrahiya 26º 21' 34.231" N 82º 44' 22.344" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC-Zink Alum 225/16 Gauspur Kakrahiya 26º 21' 34.231" N 82º 44' 22.344" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 150 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 15.836
2 HDPE Pipe PN-6: Class PE-100 75 9.633
3 HDPE Pipe PN-6: Class PE-100 90 2.939
4 HDPE Pipe PN-6: Class PE-100 110 1.395
5 HDPE Pipe PN-6: Class PE-100 140 1.102
6 HDPE Pipe PN-6: Class PE-100 160 0.432
HSC Connection
Sno. Total Nos.
1 513
Other Details
3.21
0.00
3.18
31-Mar-2026
01-Jun-2026