Project Completion Certificate (Ground Water)
Scheme ID: 20085072 Name of Scheme: CHANDAUKA WSS No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 3880 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Mar-2024 Actual Date of Completion (Capex): 05-May-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 18.06/57.77 CHANDAUKA 26º 24' 27.558" N 82º 16' 30.592" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump 39/46 CHANDAUKA 26º 24' 27.558" N 82º 16' 30.592" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC-Zink Alum Tank 17514 CHANDAUKA 26º 24' 27.558" N 82º 16' 30.592" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 20.882
2 HDPE Pipe PN-6: Class PE-100 75 2.643
3 HDPE Pipe PN-6: Class PE-100 90 0.731
4 HDPE Pipe PN-6: Class PE-100 125 0.662
5 HDPE Pipe PN-6: Class PE-100 140 0.618
6 HDPE Pipe PN-6: Class PE-100 160 1.12
7 HDPE Pipe PN-6: Class PE-100 200 0.037
HSC Connection
Sno. Total Nos.
1 598
Other Details
282.02
0.00
0.00
10-Oct-2026
11-Oct-2026