| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20085354 | Name of Scheme: MUNJDAND PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 3 | No. of Habitation Covered: 5 |
| Total Population Covered: 1421 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 22-Mar-2025 | Actual Date of Completion (Capex): 02-Apr-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Plain Pipe 150mm dia | 77.63 | TW | 26.07899 | 83.511002 |
| 2 | Slotted Pipe 150mm dia | 24 | TW | 26.07899 | 83.511002 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 600/56 | TW | 26.07899 | 83.511002 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Zinc Tank | 100/12 | OHT | 26.078997 | 83.510851 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI k9 | 80 | 0.03 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PN6 PE100 | 63 | 4.47 | |
| 2 | HDPE PN6 PE100 | 75 | 0.68 | |
| 3 | HDPE PN6 PE100 | 90 | 0.55 | |
| 4 | HDPE PN6 PE100 | 110 | 0.31 | |
| 5 | HDPE PN6 PE100 | 140 | 0.15 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 284 |