Project Completion Certificate (Ground Water)
Scheme ID: 20085366 Name of Scheme: KHAIRA NASIR PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2440 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-Mar-2025 Actual Date of Completion (Capex): 05-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Depth of Strainer (m) 23.99 TW 26.087219 83.666137
2 Depth of Plain Pipe (m) 32 TW 26.087219 83.666137
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible pump 600/56 TW 26.087219 83.666137
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Zinc Tank 150/12 OHT 26.087219 83.666137
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI k9 80 0.03 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN6 PE 100 63 8.28
2 HDPE PN6 PE 100 75 1.15
3 HDPE PN6 PE 100 90 1.10
4 HDPE PN6 PE 100 110 0.65
5 HDPE PN6 PE 100 125 0.12
HSC Connection
Sno. Total Nos.
1 322
Other Details
2.66
2.65
0.00
04-May-2025
05-May-2025