Project Completion Certificate (Ground Water)
Scheme ID: 20085609 Name of Scheme: Bhagwanpur badaiya Water Supply Scheme No. of Villages: 4 No. of Habitation Covered: 6
Total Population Covered: 1694 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-Sep-2024 Actual Date of Completion (Capex): 30-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 12(m) / 61(m) Bhagwanpur Badaiya 26.0132 81.359858
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 490(M³) / 49(Mtr.) Bhagwanpur Badaiya 26.0132 81.359858
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Elevated Storage Reservoir 150 (KL) / 16(Mtr.) Bhagwanpur Badaiya 26.0132 81.359858
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K9 150 0.015
2 DI-K9 100 0.007
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.367
2 HDPE 75 2.716
3 HDPE 90 2.031
4 HDPE 110 0.756
5 HDPE 125 0.510
6 HDPE 140 0.215
7 HDPE 160 0.630
HSC Connection
Sno. Total Nos.
1 240
Other Details
2.05
0.00
2.05
08-Oct-2024
09-Dec-2024