| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20085609 | Name of Scheme: Bhagwanpur badaiya Water Supply Scheme | No. of Villages: 4 | No. of Habitation Covered: 6 |
| Total Population Covered: 1694 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 22-Sep-2024 | Actual Date of Completion (Capex): 30-Jun-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 12(m) / 61(m) | Bhagwanpur Badaiya | 26.0132 | 81.359858 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 490(M³) / 49(Mtr.) | Bhagwanpur Badaiya | 26.0132 | 81.359858 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Elevated Storage Reservoir | 150 (KL) / 16(Mtr.) | Bhagwanpur Badaiya | 26.0132 | 81.359858 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI-K9 | 150 | 0.015 | |
| 2 | DI-K9 | 100 | 0.007 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 5.367 | |
| 2 | HDPE | 75 | 2.716 | |
| 3 | HDPE | 90 | 2.031 | |
| 4 | HDPE | 110 | 0.756 | |
| 5 | HDPE | 125 | 0.510 | |
| 6 | HDPE | 140 | 0.215 | |
| 7 | HDPE | 160 | 0.630 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 240 |