Project Completion Certificate (Ground Water)
Scheme ID: 20085610 Name of Scheme: SEVA No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1710 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jul-2023 Actual Date of Completion (Capex): 28-Feb-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 14.99Mtr/ 89.88Mtr SEVA 27.486291 80.101225
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.2 M³ per Min /45Mtr SEVA 27.486291 80.101225
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 50 KL / 16Mtr SEVA 27.486067 80.101182
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 80 0.01666
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 3.365
2 HDPE Pipe PN-6: Class PE-100 75 4.109
3 HDPE Pipe PN-6: Class PE-100 90 0.360
4 HDPE Pipe PN-6: Class PE-100 110 0.459
5 HDPE Pipe PN-6: Class PE-100 125 0.206
6 HDPE Pipe PN-6: Class PE-100 140 0.068
HSC Connection
Sno. Total Nos.
1 251
Other Details
1.57
0.00
1.47
27-May-2023
24-Dec-2024