| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20085648 | Name of Scheme: SARAIYAN (GOGP) | No. of Villages: 4 | No. of Habitation Covered: 5 |
| Total Population Covered: 5530 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 26-Jul-2023 | Actual Date of Completion (Capex): 25-May-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewells | 32.06Mtr/ 109.25Mtr | SARAIYAN (GOGP) | 27.559931 | 80.282393 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 1.3 M³ per Min /45Mtr | SARAIYAN (GOGP) | 27.559931 | 80.282393 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 350KL/ 16Mtr | SARAIYAN (GOGP) | 27.559953 | 80.282337 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I Pipe | 200 | 0.02211 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6, Class PE-100 | 63 | 5.908 | |
| 2 | HDPE Pipe PN-6, Class PE-100 | 75 | 3.967 | |
| 3 | HDPE Pipe PN-6, Class PE-100 | 90 | 2.454 | |
| 4 | HDPE Pipe PN-6, Class PE-100 | 110 | 2.450 | |
| 5 | HDPE Pipe PN-6, Class PE-100 | 125 | 2.280 | |
| 6 | HDPE Pipe PN-6, Class PE-100 | 140 | 4.008 | |
| 7 | HDPE Pipe PN-6, Class PE-100 | 160 | 1.141 | |
| 8 | HDPE Pipe PN-6, Class PE-100 | 200 | 0.063 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 761 |