Project Completion Certificate (Ground Water)
Scheme ID: 20085661 Name of Scheme: BHATMAU & ANKARA WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 6
Total Population Covered: 3236 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 20-Mar-2024 Actual Date of Completion (Capex): 23-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 21.05/111.78 BHATMAU & ANKARA 26.523792 81.633853
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE - 1 680 LPM/ 52 M BHATMAU & ANKARA 26.523792 81.633853
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 200 KL / 14 M BHATMAU & ANKARA 26.523792 81.633853
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 150 0.023
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.392
2 HDPE 90 1.408
3 HDPE 110 0.099
4 HDPE 140 1.884
5 HDPE 160 0.270
6 HDPE 200 1.139
HSC Connection
Sno. Total Nos.
1 360
Other Details
3.41
0.00
3.39
23-Jan-2025
24-Apr-2025