Project Completion Certificate (Ground Water)
Scheme ID: 20085662 Name of Scheme: BAGAHI WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 9
Total Population Covered: 3666 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 20-Mar-2024 Actual Date of Completion (Capex): 15-Nov-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 22.13/57.72 BAGAHI 26.436785 81.644483
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE - 1 770 LPM/54 M BAGAHI 26.436785 81.644483
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 225 KL /16 M BAGAHI 26.436785 81.644483
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 150 0.024
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.754
2 HDPE 90 2.812
3 HDPE 110 3.065
4 HDPE 140 0.483
5 HDPE 160 0.711
6 HDPE 200 0.248
HSC Connection
Sno. Total Nos.
1 755
Other Details
3.97
0.00
3.94
15-Feb-2025
16-May-2025