Project Completion Certificate (Ground Water)
Scheme ID: 20085675 Name of Scheme: NAINAHAH VARTALI WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 12
Total Population Covered: 2325 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 13-Mar-2024 Actual Date of Completion (Capex): 16-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 29 / 316.80 NAINAHAH VARTALI 26.087525 81.751248
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 500 LPM / 52 M NAINAHAH VARTALI 26.087525 81.751248
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 KL / 14 NAINAHAH VARTALI 26.087525 81.751248
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.025
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.942
2 HDPE 90 1.302
3 HDPE 110 0.763
4 HDPE 140 0.728
5 HDPE 160 0.367
HSC Connection
Sno. Total Nos.
1 412
Other Details
2.95
0.00
2.93
16-Sep-2024
17-Dec-2024