| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20085677 | Name of Scheme: BHATGAWAN WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 9 |
| Total Population Covered: 5311 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 29-Apr-2024 | Actual Date of Completion (Capex): 17-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 18.03 M / 54.08 M | BHATGAWAN | 26.3035514 | 81.65711676 |
| 2 | TUBEWELL 02 | 18.02 M/ 45.95 M | BHATGAWAN | 26.3001487 | 81.65799771 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE 01 | 550 LPM 52 M | BHATGAWAN | 26.3035514 | 81.65711676 |
| 2 | SUBMERSIBLE 02 | 550 LPM / 52 M | BHATGAWAN | 26.3001487 | 81.65799771 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 325 KL / 14 M | BHATGAWAN | 26.3035514 | 81.65711676 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.542 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 16.165 | |
| 2 | HDPE | 90 | 6.711 | |
| 3 | HDPE | 110 | 2.450 | |
| 4 | HDPE | 140 | 0.663 | |
| 5 | HDPE | 160 | 0.026 | |
| 6 | HDPE | 180 | 0.610 | |
| 7 | HDPE | 200 | 0.740 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |