Project Completion Certificate (Ground Water)
Scheme ID: 20085677 Name of Scheme: BHATGAWAN WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 9
Total Population Covered: 5311 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 29-Apr-2024 Actual Date of Completion (Capex): 17-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 18.03 M / 54.08 M BHATGAWAN 26.3035514 81.65711676
2 TUBEWELL 02 18.02 M/ 45.95 M BHATGAWAN 26.3001487 81.65799771
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 01 550 LPM 52 M BHATGAWAN 26.3035514 81.65711676
2 SUBMERSIBLE 02 550 LPM / 52 M BHATGAWAN 26.3001487 81.65799771
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 325 KL / 14 M BHATGAWAN 26.3035514 81.65711676
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.542
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 16.165
2 HDPE 90 6.711
3 HDPE 110 2.450
4 HDPE 140 0.663
5 HDPE 160 0.026
6 HDPE 180 0.610
7 HDPE 200 0.740
HSC Connection
Sno. Total Nos.
Other Details
6.32
0.00
5.92
17-Mar-2025
18-Jun-2025