Project Completion Certificate (Ground Water)
Scheme ID: 20085680 Name of Scheme: ARGWAN & SAKRAWA WATER SUPPLY SCHEME No. of Villages: 4 No. of Habitation Covered: 8
Total Population Covered: 4459 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 28-Apr-2024 Actual Date of Completion (Capex): 20-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 16/84.95 ARGWAN & SAKRAWAN 26.17052606 81.67891
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 940 LPM / 56 Mtr ARGWAN & SAKRAWAN 26.17052606 81.67891
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 275 Kl / 18 M ARGWAN & SAKRAWAN 26.17052606 81.67891
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 17.70
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 0.6
2 HDPE 63 11.67
3 HDPE 110 0.202
4 HDPE 140 0.98
5 HDPE 160 0.307
6 HDPE 180 1.81
7 HDPE 200 3.98
HSC Connection
Sno. Total Nos.
1 875
Other Details
4.98
0.00
4.97
20-Sep-2024
21-Dec-2024