| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20085687 | Name of Scheme: PANDIRI WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 20 |
| Total Population Covered: 3346 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 13-Mar-2024 | Actual Date of Completion (Capex): 10-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 25.05/72.29 | PANDIRI | 26.135065 | 81.703092 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 700 LPM/ 520M | PANDIRI | 26.135065 | 81.703092 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200 KL / 14M | PANDIRI | 26.135065 | 81.703092 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.017 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 9.505 | |
| 2 | HDPE | 90 | 4.799 | |
| 3 | HDPE | 110 | 1.215 | |
| 4 | HDPE | 140 | 1.934 | |
| 5 | HDPE | 160 | 1.183 | |
| 6 | HDPE | 180 | 0.774 | |
| 7 | HDPE | 200 | 0.017 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 637 |