Project Completion Certificate (Ground Water)
Scheme ID: 20085690 Name of Scheme: KOTWAR MAU WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 8
Total Population Covered: 1969 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 29-Apr-2024 Actual Date of Completion (Capex): 21-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 31.12 M / 106.73 M KOTWAR MAU 28.933147 77.891343
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 420 LPM / 52 M KOTWAR MAU 28.933147 77.891343
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 125 KL / 14 M KOTWAR MAU 28.933147 77.891343
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.025
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.812
2 HDPE 90 0.464
3 HDPE 110 0.588
4 HDPE 140 0.810
5 HDPE 160 0.694
HSC Connection
Sno. Total Nos.
1 341
Other Details
2.42
0.00
2.40
21-Sep-2024
22-Dec-2024