| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20085692 | Name of Scheme: ANI BAIJAL WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 5 |
| Total Population Covered: 3687 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 29-Apr-2024 | Actual Date of Completion (Capex): 14-Aug-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 23.05/79.26 | ANI BAIJAL | 26.166317 | 81.175061 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Punp -1 | 800LPM/52 | ANI BAIJAL | 26.166317 | 81.175061 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 225KL / 14 mtr | ANI BAIJAL | 26.166317 | 81.175061 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 150 | 21.40 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PN-6 | 63 | 12.35 | |
| 2 | HDPE PN-6 | 90 | 1.83 | |
| 3 | HDPE PN-6 | 110 | 1.84 | |
| 4 | HDPE PN-6 | 140 | 0.13 | |
| 5 | HDPE PN-6 | 200 | 0.01 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 760 |