Project Completion Certificate (Ground Water)
Scheme ID: 20085694 Name of Scheme: BASAIKPUR WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 2135 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 29-Apr-2024 Actual Date of Completion (Capex): 05-Nov-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 22.52/116.52 BASAIKPUR 26.16900108 81.738658
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 450/50 BASAIKPUR 26.16900108 81.738658
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 125/12 BASAIKPUR 26.16900108 81.738658
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 28.56
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.92
2 HDPE 90 2.00
3 HDPE 110 0.93
4 HDPE 140 0.79
5 HDPE 160 0.025
HSC Connection
Sno. Total Nos.
1 456
Other Details
2.53
0.00
2.49
05-Feb-2025
06-May-2025