Project Completion Certificate (Ground Water)
Scheme ID: 20085724 Name of Scheme: BOJHI MOLA MAU & BAGAIL WATER SUPPLY SCHEME No. of Villages: 4 No. of Habitation Covered: 12
Total Population Covered: 6469 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 25-Dec-2024 Actual Date of Completion (Capex): 30-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 150MM PLAIN PIPE 489.10 BOJHI MOLA MAU 26.247429 81.492539
2 200MM PLAIN PIPE 132.00 BOJHI MOLA MAU 26.247429 81.492539
3 150MM SLOTTED PIPE 75.00 BOJHI MOLA MAU 26.247429 81.492539
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 540 LPM / 56 M BOJHI MOLA MAU 26.247429 81.492539
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300 KL / 18 M BOJHI MOLA MAU 26.247429 81.492539
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.800
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 1.934
2 HDPE PIPE 75 1.026
3 HDPE PIPE 63 19.495
4 HDPE PIPE 110 1.392
5 HDPE PIPE 125 3.177
6 HDPE PIPE 160 2.556
7 HDPE PIPE 180 1.180
8 HDPE PIPE 200 0.008
HSC Connection
Sno. Total Nos.
1 995
Other Details
6.47
0.00
6.47
02-Sep-2024
15-Dec-2024