Project Completion Certificate (Ground Water)
Scheme ID: 20085725 Name of Scheme: JAMALPUR RAMPUR & TARAUNA WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 16
Total Population Covered: 4652 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 12-Jul-2024 Actual Date of Completion (Capex): 07-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 300MM PLAIN PIPE 58 JAMALPUR 26.264087 81.383352
2 300MM SLOTTED PIPE 8 JAMALPUR 26.264087 81.383352
3 150MM PLAIN PIPE 257.80 JAMALPUR 26.264087 81.383352
4 150MM SLOTTED PIPE 19 JAMALPUR 26.264087 81.383352
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 990LPM / 56MTR JAMALPUR 26.264087 81.383352
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVER HEAD TANK 275KL / 18MTR JAMALPUR 26.264087 81.383352
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 150 .053
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 1.69
2 HDPE PIPE 75 2.21
3 HDPE PIPE 63 29.06
4 HDPE PIPE 110 1.781
5 HDPE PIPE 125 1.85
6 HDPE PIPE 140 1.21
7 HDPE PIPE 200 1.29
HSC Connection
Sno. Total Nos.
1 925
Other Details
5.92
0.00
5.85
08-Jun-2024
15-Dec-2024