Scheme ID: 20085727 Name of Scheme: KADERGAWN WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 6
Total Population Covered: 3943 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 12-Mar-2025 Actual Date of Completion (Capex): 09-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 150 MM PLAIN PIPE 3 KADERGAWN 26.170678 81.854585
2 300 MM PLAIN PIPE 54.50 KADERGAWN 26.170678 81.854585
3 300 MM SLOTTED PIPE 15 KADERGAWN 26.170678 81.854585
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUMERSIBLE PUMP 660LPM /52 M KADERGAWN 26.170678 81.854585
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200 KL /14 M KADERGAWN 26.170678 81.854585
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.022
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 6.26
2 HDPE PIPE 63 10.05
3 HDPE PIPE 110 0.605
4 HDPE PIPE 125 0.45
5 HDPE PIPE 140 0.344
HSC Connection
Sno. Total Nos.
1 563
Other Details
3.67
0.00
3.60
09-Sep-2024
15-Dec-2024