| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20085727 | Name of Scheme: KADERGAWN WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 6 |
| Total Population Covered: 3943 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 12-Mar-2025 | Actual Date of Completion (Capex): 09-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 150 MM PLAIN PIPE | 3 | KADERGAWN | 26.170678 | 81.854585 |
| 2 | 300 MM PLAIN PIPE | 54.50 | KADERGAWN | 26.170678 | 81.854585 |
| 3 | 300 MM SLOTTED PIPE | 15 | KADERGAWN | 26.170678 | 81.854585 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUMERSIBLE PUMP | 660LPM /52 M | KADERGAWN | 26.170678 | 81.854585 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200 KL /14 M | KADERGAWN | 26.170678 | 81.854585 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.022 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 90 | 6.26 | |
| 2 | HDPE PIPE | 63 | 10.05 | |
| 3 | HDPE PIPE | 110 | 0.605 | |
| 4 | HDPE PIPE | 125 | 0.45 | |
| 5 | HDPE PIPE | 140 | 0.344 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 563 |