Project Completion Certificate (Ground Water)
Scheme ID: 20085730 Name of Scheme: LUGARI WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 2464 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 20-Jan-2025 Actual Date of Completion (Capex): 28-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 150MM PLAIN PIPE 234.80 LUGRI WSS 26.18338 81.65256
2 200MM PLAIN PIPE 57.00 LUGRI WSS 26.18338 81.65256
3 150MM SLOTTED PIPE 15.00 LUGRI WSS 26.18338 81.65256
4 200MM SLOTTED PIPE 9.00 LUGRI WSS 26.18338 81.65256
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 170 LPM / 54 M LUGRI WSS 26.18338 81.65256
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 75 KL / 16 M LUGRI WSS 26.18338 81.65256
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.028
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 0.622
2 HDPE PIPE 75 0.88
3 HDPE PIPE 63 9.551
4 HDPE PIPE 110 0.958
5 HDPE PIPE 125 1.340
6 HDPE PIPE 140 1.368
7 HDPE PIPE 160 0.100
HSC Connection
Sno. Total Nos.
1 411
Other Details
2.49
0.00
2.49
30-Sep-2024
15-Jan-2025