Project Completion Certificate (Ground Water)
Scheme ID: 20085732 Name of Scheme: PIDHI WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 28
Total Population Covered: 10242 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 29-Sep-2024 Actual Date of Completion (Capex): 22-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 150MM PLAIN PIPE 539.6 PIDHI 26.279896 81.414168
2 300MM PLAIN PIPE 115 PIDHI 26.279896 81.414168
3 150MM SLOTTED PIPE 46 PIDHI 26.279896 81.414168
4 300MM SLOTTED PIPE 17 PIDHI 26.279896 81.414168
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUMERSIBLE PUMP 1100 LPM / 56 M PIDHI 26.279896 81.414168
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 625 KL / 18 M PIDHI 26.279896 81.414168
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 150 0.161
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE (63-200) 200 38.395
HSC Connection
Sno. Total Nos.
1 1992
Other Details
10.75
0.00
10.74
25-Sep-2024
05-Jan-2025