Project Completion Certificate (Ground Water)
Scheme ID: 20085735 Name of Scheme: MOHANA WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 20
Total Population Covered: 12445 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 15-Apr-2025 Actual Date of Completion (Capex): 06-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 150 MM PLAIN PIPE 469.10 MOHANA WSS 26.279090 81.505263
2 300 MM PLAIN PIPE 120.50 MOHANA WSS 26.279090 81.505263
3 150 MM SLOTTED PIPE 66.00 MOHANA WSS 26.279090 81.505263
4 300 MM SLOTTED PIPE 11.00 MOHANA WSS 26.279090 81.505263
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 1050 LPM /56 M MOHANA WSS 26.279090 81.505263
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 600 KL / 18 M MOHANA WSS 26.279090 81.505263
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 1.095
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 3.309
2 HDPE PIPE 75 2.21
3 HDPE PIPE 63 27.61
4 HDPE PIPE 110 2.879
5 HDPE PIPE 125 2.666
6 HDPE PIPE 140 3.239
7 HDPE PIPE 180 0.192
8 HDPE PIPE 200 1.155
HSC Connection
Sno. Total Nos.
1 1772
Other Details
9.56
0.00
9.52
10-Dec-2024
15-Mar-2025