Project Completion Certificate (Ground Water)
Scheme ID: 20085825 Name of Scheme: KAIMA WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 7
Total Population Covered: 2762 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-Mar-2025 Actual Date of Completion (Capex): 14-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 150MM PLAIN PIPE 48.80 KAIMA 26.433507 81.712631
2 150MM SLOTTED PIPE 12 KAIMA 26.433507 81.712631
3 200MM PLAIN PIPE 62.50 KAIMA 26.433507 81.712631
4 200MM SLOTTED PIPE 10 KAIMA 26.433507 81.712631
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 240LPM / 54MTR KAIMA 26.433507 81.712631
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVER HEAD TANK 100KL / 16MTR KAIMA 26.433507 81.712631
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 0.025
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 0.549
2 HDPE PIPE 75 0.761
3 HDPE PIPE 63 19.673
4 HDPE PIPE 110 2.170
5 HDPE PIPE 125 1.664
6 HDPE PIPE 140 0.019
HSC Connection
Sno. Total Nos.
1 663
Other Details
3.30
0.00
3.28
20-Dec-2024
10-Mar-2025