Project Completion Certificate (Ground Water)
Scheme ID: 20085845 Name of Scheme: KATRA MAHARANI & DANDUPUR WATER SUPPLY SCHEME No. of Villages: 4 No. of Habitation Covered: 8
Total Population Covered: 5308 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 15-Jan-2025 Actual Date of Completion (Capex): 25-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 150MM PLAIN PIPE 11.00 KATRA MAHARANI & DANDUPUR 26.21403 8/1.79740
2 300MM PLAIN PIPE 52.00 KATRA MAHARANI & DANDUPUR 26.21403 8/1.79740
3 150MM SLOTTED PIPE 5.00 KATRA MAHARANI & DANDUPUR 26.21403 81.79740
4 300MM SLOTTED PIPE 18.00 KATRA MAHARANI & DANDUPUR 26.21403 81.79740
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 880 LPM / 54 M KATRA MAHARANI & DANDUPUR 26.21403 81.79740
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250KL / 16M KATRA MAHARANI & DANDUPUR 26.21403 81.79740
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.013
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 1.186
2 HDPE PIPE 75 0.426
3 HDPE PIPE 63 17.038
4 HDPE PIPE 110 4.206
5 HDPE PIPE 140 1.410
6 HDPE PIPE 160 1.319
7 HDPE PIPE 200 0.024
HSC Connection
Sno. Total Nos.
1 906
Other Details
5.10
0.00
5.05
27-Sep-2024
10-Jan-2025