Project Completion Certificate (Ground Water)
Scheme ID: 20085851 Name of Scheme: RAMDEYPUR WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 2483 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 13-Sep-2024 Actual Date of Completion (Capex): 04-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Plain Pipe (m) 150 4 RAMDEYPUR 26.199663 81.78936
2 Plain Pipe (m) 200 47.5 RAMDEYPUR 26.199663 81.78936
3 Strainer 19 RAMDEYPUR 26.199663 81.78936
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUMMERSIBLE Pump 530 RAMDEYPUR 26.199663 81.78936
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT's 150KL/18M RAMDEYPUR 26.199663 81.78936
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 .0027
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe 90 1.337
2 HDPE Pipe 75 0.703
3 HDPE Pipe 63 10.68
4 HDPE Pipe 110 .115
5 HDPE Pipe 140 .663
6 HDPE Pipe 160 .188
HSC Connection
Sno. Total Nos.
Other Details
3.09
0.00
3.03
07-Dec-2024
15-Mar-2025