| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20085858 | Name of Scheme: TRILOKPUR WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 7 |
| Total Population Covered: 3423 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 13-Sep-2024 | Actual Date of Completion (Capex): 10-Apr-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 9M/46M | Trilokpur | 26.207351 | 81.778124 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 720LPM/52 M | Trilokpur | 26.207351 | 81.778124 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT -1 | 225KL/14M | Trilokpur | 26.207351 | 81.778124 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | .015 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 8.602 | |
| 2 | HDPE | 90 | 3.155 | |
| 3 | HDPE | 110 | 2.074 | |
| 4 | HDPE | 140 | .571 | |
| 5 | HDPE | 180 | .456 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 596 |