Project Completion Certificate (Ground Water)
Scheme ID: 20085858 Name of Scheme: TRILOKPUR WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 7
Total Population Covered: 3423 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 13-Sep-2024 Actual Date of Completion (Capex): 10-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 9M/46M Trilokpur 26.207351 81.778124
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 720LPM/52 M Trilokpur 26.207351 81.778124
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 225KL/14M Trilokpur 26.207351 81.778124
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 .015
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8.602
2 HDPE 90 3.155
3 HDPE 110 2.074
4 HDPE 140 .571
5 HDPE 180 .456
HSC Connection
Sno. Total Nos.
1 596
Other Details
4.19
0.00
3.72
20-Jul-2024
25-Nov-2024