Project Completion Certificate (Ground Water)
Scheme ID: 20085872 Name of Scheme: LAKHANKHEDA No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2100 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 14-Mar-2024 Actual Date of Completion (Capex): 03-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 DEEP TUBEWELL (450 LPM) 18.04/117.47 LAKHANA KHEDA 26.060742 80.521705
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 12.5 HP SUBMERSIBLE PUMP 450 LPM/60 MTR LAKHANA KHEDA 26.060742 80.521705
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 ELEVATED STORAGE RESERVOIR 125KL/14M LAKHANA KHEDA 26.060742 80.521705
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 63 3.918
2 HDPE PIPE 75 0.085
3 HDPE PIPE 90 0.415
4 HDPE PIPE 125 1.171
5 HDPE PIPE 140 0.329
6 HDPE PIPE 180 0.144
HSC Connection
Sno. Total Nos.
1 430
Other Details
1.87
0.15
1.72
10-Mar-2025
10-Mar-2025