Scheme ID: 20086834 Name of Scheme: KEWTALI WSS No. of Villages: 6 No. of Habitation Covered: 9
Total Population Covered: 4270 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 23-Mar-2024 Actual Date of Completion (Capex): 22-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of Tubewell Assembly 33.14M/47.96M Kewatli 26.434377 83.021232
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 15 HP Submersible Pump 890LPM/45M Kewatli 26.434377 83.021232
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 150 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 1.316
2 HDPE Pipe PN-6: Class PE-100 75 2.783
3 HDPE Pipe PN-6: Class PE-100 63 15.298
4 HDPE Pipe PN-6: Class PE-100 110 1.877
5 HDPE Pipe PN-6: Class PE-100 125 0.622
6 HDPE Pipe PN-6: Class PE-100 140 1.206
7 HDPE Pipe PN-6: Class PE-100 160 0.885
8 HDPE Pipe PN-6: Class PE-100 180 1.200
9 HDPE Pipe PN-6: Class PE-100 200 0.739
HSC Connection
Sno. Total Nos.
1 585
Other Details
3.54
3.54
3.54
22-Mar-2025
23-Mar-2025