| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20087918 | Name of Scheme: Shahabpura Ratan Singh Village Water Supply Scheme | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 6354 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 13-Mar-2025 | Actual Date of Completion (Capex): 15-Apr-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 18./126.11 | Shahabpura Ratan singh | 29.468476 | 78.226681 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submerssible Pump 10 HP | 1040 LPM/44 | Shahabpura Ratan singh | 29.468476 | 78.226681 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 300/14 | Shahabpura Ratan singh | 29.468476 | 78.226681 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D I K-7 Pipe | 200 | 0.029 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6, PE-100 | 63 | 7.37 | |
| 2 | HDPE Pipe PN-6, PE-100 | 75 | 1.60 | |
| 3 | HDPE Pipe PN-6, PE-100 | 90 | 0.51 | |
| 4 | HDPE Pipe PN-6, PE-100 | 110 | 0.25 | |
| 5 | HDPE Pipe PN-6, PE-100 | 125 | 0.36 | |
| 6 | HDPE Pipe PN-6, PE-100 | 140 | 0.26 | |
| 7 | HDPE Pipe PN-6, PE-100 | 160 | 0.13 | |
| 8 | HDPE Pipe PN-6, PE-100 | 200 | 0.17 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 800 |