| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20088206 | Name of Scheme: MURARPUR GRAM PANCHAYAT WATER VSUPPLY SCHEME | No. of Villages: 4 | No. of Habitation Covered: 10 |
| Total Population Covered: 2170 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 30-Nov-2024 | Actual Date of Completion (Capex): 15-Jan-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Plain pipe 150mm dai | 60 | TW | 26.134776 | 83.662550 |
| 2 | Plain pipe 200mm dia | 54 | TW | 26.134776 | 83.662550 |
| 3 | Slotted pipe 150mm dia | 24 | TW | 26.134776 | 83.662550 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible pump | 430LPM/44 | TW | 26.134776 | 83.662550 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Zincalume tank | 125/14 | OHT | 26.134776 | 83.662550 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K7 | 100 | 0.03 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PN6 PE100 | 63 | 8.64 | |
| 2 | HDPE PN6 PE100 | 75 | 1.01 | |
| 3 | HDPE PN6 PE100 | 90 | 1.12 | |
| 4 | HDPE PN6 PE100 | 110 | 0.864 | |
| 5 | HDPE PN6 PE100 | 125 | 0.645 | |
| 6 | HDPE PN6 PE100 | 140 | 0.495 | |
| 7 | HDPE PN6 PE100 | 180 | 0.058 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |