Project Completion Certificate (Ground Water)
Scheme ID: 20088206 Name of Scheme: MURARPUR GRAM PANCHAYAT WATER VSUPPLY SCHEME No. of Villages: 4 No. of Habitation Covered: 10
Total Population Covered: 2170 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-Nov-2024 Actual Date of Completion (Capex): 15-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Plain pipe 150mm dai 60 TW 26.134776 83.662550
2 Plain pipe 200mm dia 54 TW 26.134776 83.662550
3 Slotted pipe 150mm dia 24 TW 26.134776 83.662550
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible pump 430LPM/44 TW 26.134776 83.662550
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Zincalume tank 125/14 OHT 26.134776 83.662550
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K7 100 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN6 PE100 63 8.64
2 HDPE PN6 PE100 75 1.01
3 HDPE PN6 PE100 90 1.12
4 HDPE PN6 PE100 110 0.864
5 HDPE PN6 PE100 125 0.645
6 HDPE PN6 PE100 140 0.495
7 HDPE PN6 PE100 180 0.058
HSC Connection
Sno. Total Nos.
Other Details
174.92
0.00
176.93
15-Jan-2025
16-Jan-2025