Project Completion Certificate (Ground Water)
Scheme ID: 20088702 Name of Scheme: Dobaa Mafi PWS No. of Villages: 1 No. of Habitation Covered: 9
Total Population Covered: 6146 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 01-Jun-2024 Actual Date of Completion (Capex): 13-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 9.798
2 HDPE 90 5.410
3 HDPE 110 1.653
4 HDPE 125 .492
5 HDPE 140 .151
6 HDPE 160 .429
7 HDPE 180 .831
HSC Connection
Sno. Total Nos.
Other Details
4.43
0.00
0.00
25-Feb-2024
13-Apr-2024