| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20088762 | Name of Scheme: KAYAMPUR | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 1623 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 05-Mar-2023 | Actual Date of Completion (Capex): 24-Mar-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewells | 18.13 Mtr/ 107.23 Mtr | KAYAMPUR | 27.496123 | 80.16973 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 0.4 M³ per Min /43 Mtr | KAYAMPUR | 27.496123 | 80.16973 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 150 KL/ 14 Mtr | KAYAMPUR | 27.496097 | 80.169723 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. Pipe | 150 | 0.02486 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6, Class PE-100 | 63 | 1.102 | |
| 2 | HDPE Pipe PN-6, Class PE-100 | 75 | 0.756 | |
| 3 | HDPE Pipe PN-6, Class PE-100 | 90 | 0.357 | |
| 4 | HDPE Pipe PN-6, Class PE-100 | 110 | 0.372 | |
| 5 | HDPE Pipe PN-6, Class PE-100 | 140 | 0.353 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 186 |