Project Completion Certificate (Ground Water)
Scheme ID: 20088762 Name of Scheme: KAYAMPUR No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1623 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 05-Mar-2023 Actual Date of Completion (Capex): 24-Mar-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 18.13 Mtr/ 107.23 Mtr KAYAMPUR 27.496123 80.16973
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.4 M³ per Min /43 Mtr KAYAMPUR 27.496123 80.16973
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150 KL/ 14 Mtr KAYAMPUR 27.496097 80.169723
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.02486
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 1.102
2 HDPE Pipe PN-6, Class PE-100 75 0.756
3 HDPE Pipe PN-6, Class PE-100 90 0.357
4 HDPE Pipe PN-6, Class PE-100 110 0.372
5 HDPE Pipe PN-6, Class PE-100 140 0.353
HSC Connection
Sno. Total Nos.
1 186
Other Details
1.76
0.00
1.63
23-Jun-2023
24-Dec-2024