Project Completion Certificate (Ground Water)
Scheme ID: 20089179 Name of Scheme: SIKRAUDA WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2275 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 02-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 30.17 / 160.99 Sikroudha 29.625098 78.237716
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 550 / 60 Sikroudha 29.625098 78.237716
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150 / 18 Sikroudha 29.625098 78.237716
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 100 0.033
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.610
2 HDPE 75 1.322
3 HDPE 90 0.101
4 HDPE 110 0.758
5 HDPE 125 0.240
6 HDPE 140 0.067
7 HDPE 160 0.325
HSC Connection
Sno. Total Nos.
1 565
Other Details
2.29
0.00
2.34
02-Nov-2025
03-Nov-2025