Project Completion Certificate (Ground Water)
Scheme ID: 20089346 Name of Scheme: JAJAMOIYA No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2000 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 13-Mar-2024 Actual Date of Completion (Capex): 20-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 450 LPM 18.25/125.1 M Jajmoiya 26.035696 80.31658
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 12.5 HP 450 LPM/ 57 M Jajmoiya 26.035696 80.31658
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 125 KL/ 12 M Jajmoiya 26.035696 80.31658
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.028
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.660
2 HDPE 90 0.638
3 HDPE 110 0.296
4 HDPE 125 0.4011
5 HDPE 140 0.3205
6 HDPE 160 1.675
7 HDPE 180 0.082
HSC Connection
Sno. Total Nos.
1 305
Other Details
1.98
0.00
1.98
05-Aug-2025
06-Aug-2025