| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20089346 | Name of Scheme: JAJAMOIYA | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 2000 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 13-Mar-2024 | Actual Date of Completion (Capex): 20-Mar-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well 450 LPM | 18.25/125.1 M | Jajmoiya | 26.035696 | 80.31658 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible 12.5 HP | 450 LPM/ 57 M | Jajmoiya | 26.035696 | 80.31658 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 125 KL/ 12 M | Jajmoiya | 26.035696 | 80.31658 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 100 | 0.028 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 2.660 | |
| 2 | HDPE | 90 | 0.638 | |
| 3 | HDPE | 110 | 0.296 | |
| 4 | HDPE | 125 | 0.4011 | |
| 5 | HDPE | 140 | 0.3205 | |
| 6 | HDPE | 160 | 1.675 | |
| 7 | HDPE | 180 | 0.082 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 305 |