Project Completion Certificate (Ground Water)
Scheme ID: 20089659 Name of Scheme: Pasua PWS No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 2522 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 14-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 22.0 m / 58.46 m Pasua 26.724637 79.619747
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 350 lpm / 51 m Pasua 26.724637 79.619747
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150 kl / 18 m Pasua 26.724637 79.619747
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.011
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.020
2 HDPE 90 3.193
3 HDPE 110 0.796
4 HDPE 125 797
5 HDPE 140 2.196
6 HDPE 200 1.165
HSC Connection
Sno. Total Nos.
1 471
Other Details
2.53
0.00
0.00
16-May-2026
18-May-2026