Project Completion Certificate (Ground Water)
Scheme ID: 20089903 Name of Scheme: SADARPUR WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2870 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 23-Mar-2023 Actual Date of Completion (Capex): 24-Mar-0205
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 15/36.20 SADARPUR 26.075443 82.262063
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 610LPM/44M SADARPUR 26.075443 82.262063
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175KL/12M SADARPUR 26.075347 82.262212
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE-PN-6 , PE-100 63 11.098
2 HDPE-PN-6 , PE-100 75 2.044
3 HDPE-PN-6 , PE-100 90 0.527
4 HDPE-PN-6 , PE-100 110 0.704
5 HDPE-PN-6 , PE-100 140 0.178
6 HDPE-PN-6 , PE-100 160 0.021
HSC Connection
Sno. Total Nos.
1 255
Other Details
1.94
1.94
2.05
31-Mar-2026
28-Apr-2026