Project Completion Certificate (Ground Water)
Scheme ID: 20090084 Name of Scheme: BAHERA GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 1514 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Sep-2024 Actual Date of Completion (Capex): 16-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18/81.33 BAHERA 79.732808 26.964115
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump-1 300 LPM/56 M BAHERA 79.732808 26.964115
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 75 KL/ 14 M BAHERA 79.732808 26.964115
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 80 0.002 Rising main
2 DI 100 0.0428 Rising main
3 DI 150 0.0075 Rising main
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1.51 Distribution
2 HDPE 63 1.68 Distribution
3 HDPE 110 0.413 Distribution
4 HDPE 140 0.419 Distribution
HSC Connection
Sno. Total Nos.
1 339
Other Details
1.71
1.67
1.71
17-Apr-2025
18-Apr-2025