Project Completion Certificate (Ground Water)
Scheme ID: 20090094 Name of Scheme: KISHUNPUR BASANT GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 1677 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Sep-2024 Actual Date of Completion (Capex): 03-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 9.00/77.50 KISHUNPUR BASANT 26.982662 79.623602
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSSIBLE PUMP 300/56 KISHUNPUR BASANT 26.982662 79.623602
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 75/14 KISHUNPUR BASANT 26.982662 79.623602
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 80 .0015 RISING MAINS
2 DI 100 0.01520 RISING MAINS
3 DI 150 0.005 RISING MAINS
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 4.13 DISTRIBUTION
2 HDPE 63 1.89 DISTRIBUTION
3 HDPE 110 3.711 DISTRIBUTION
4 HDPE 140 0.728 DISTRIBUTION
HSC Connection
Sno. Total Nos.
1 349
Other Details
2.06
2.06
2.06
07-Aug-2024
08-Aug-2024