Project Completion Certificate (Ground Water)
Scheme ID: 20090097 Name of Scheme: DIYORA GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 7
Total Population Covered: 4035 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Sep-2024 Actual Date of Completion (Capex): 07-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 27.28/146.04 DIYORA 26.810504 79.790972
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 850/60 DIYORA 26.810504 79.790972
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250/18 DIYORA 26.810504 79.790972
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.01975 RISING MAINS
2 DI 150 0.009 RISING MAINS
3 DI 200 0.0087 RISING MAINS
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 3.054 DISTRIBUTION
2 HDPE 63 4.33 DISTRIBUTION
3 HDPE 110 0.742 DISTRIBUTION
4 HDPE 140 0.701 DISTRIBUTION
5 HDPE 160 1.682 DISTRIBUTION
6 HDPE 180 0.597 DISTRIBUTION
7 HDPE 200 0.532 DISTRIBUTION
HSC Connection
Sno. Total Nos.
1 673
Other Details
4.06
4.01
4.06
10-Aug-2024
11-Aug-2024