Project Completion Certificate (Ground Water)
Scheme ID: 20090144 Name of Scheme: KAUL RO No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3396 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 15-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.15 Mtr / 114.17 Mtr KAUL 28.854631 77.784261
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 300 LPM / 50 Mtr KAUL 28.854631 77.784261
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100 Kl / 13 M KAUL 28.854631 77.784261
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.0219
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.943
2 HDPE 90 1.548
3 HDPE 110 0.115
4 HDPE 125 0.154
5 HDPE 140 0.810
HSC Connection
Sno. Total Nos.
1 747
Other Details
2.25
2.25
1.82
01-Feb-2025
02-Feb-2025